REGISTRATION OF INTEREST (ROI) PERIODIC SUPPLY OF DISCONNECTORS AND EARTH SWITCHES WITH A RATED VOLTAGE OF 362KV AND CURRENT OF 4000A
REGISTRATION OF INTEREST (ROI)
PERIODIC SUPPLY OF DISCONNECTORS AND EARTH SWITCHES WITH A RATED VOLTAGE OF 362KV AND CURRENT OF 4000A
The Organisation
Western Power is a Western Australian State Government owned corporation responsible for building, maintaining and operating an electricity network that connects our 2.3 million customers to traditional and renewable energy sources, delivering an essential service to our community.
The Scope
Western Power is seeking registrations of interest from suitably qualified and experienced organisations, for the provision of:
Western Power requires supply and delivery of Disconnectors and Earth Switches with a rated voltage of 362kV and a rated current of 4000A for use on the South West Interconnected System (SWIS).
Services required under the project would include:
• Assembly
• Installation
• Maintenance
• Troubleshooting
• Technical Support
A copy of Western Power’s AM – POOOO – 24 – 362 kV Disconnectors and Earth Switches – Technical Schedule
Registration Requirements
Suppliers are required to respond to the following for the ROI submission:
• Demonstrate track record and capability in delivering the Periodic Supply of Disconnectors and Earth Switches with a rated voltage of 362kV and a rated current of 4000A.
• In relation to the high-level Scope requirements stated above.
• Reference from at least three customers who have been offered similar services.
• Safety, Health & Environment information to be requested as part of this exercise.
To be considered for the inclusion in the Request for Proposal, please REGISTER your interest on the Western Power website link below by time (2PM) (AWST) Date Monday, 14 th November 2024.
Answer all questions listed in the Registration of Interest Questionnaire. If documents need to be attached to the registration, please send an email to mitul.doolabh@westernpower.com.au
Please note that registering for the opportunity does not guarantee that you will be invited to participate in a market event or become a supplier of Western Power.
NEXT STEPS
Western Power will review and evaluate the registration received against the scope requirements.